Project: BobCollins     -     Entry

Mar 10, 2023 1 Miscellaneous puttering Category: Lighting
I added the RTV red silicone to the #1 exhaust springs and added a little more to the other three.


I finished off the throttle quadrant handle. Stupidly, bought a handful of stop nuts thinking the nut on the handle was a different size than I already had.

I then moved on to the cockpit lightning and drilled out two rivets in the rollbar, clecoed on the eyeball holder, match drilled two other holes and then countersunk the three holes that hold the eyeball and brought it home for priming and painting.

The rest of my time was spent looking for the instructions and connector bag for the White Lightning Power Unit. Didn't find them and the replacement connectors has shipped. What a mystery this has become.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.