Project: BobCollins     -     Entry

Mar 28, 2024 2 Prepped emp fairing tabs Category: Empennage
Modified #27 drill bit to enlarge holes in upper fairing. Removed and added nutplate after priming each tab and then checked back to the lower fairing and screwed the top fairing on. Next step is to assure a proper gap between the parts before riveted tabs to the lower fairing.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.