Project: N18TA     -     Entry

Oct 20, 2020 2 Oil door installation Category: Cowl
The oil door on the top right rear of the cowl had been carefully fitted by Zach Chase. He attached ribs to the underside to force the door to curve to fit the curvature of the cowl at that location. Stratford in these photos rivets the door hinge to the cowl and then the hinge to the door using a rivet squeezer. After drilling the holes for the #40 rivets, he used a countersink tool so the flush head rivets sank into the fiberglass.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.