Project: VelocityXLRG     -     Entry

Jan 22, 2020 7 Repaired Wing Space for Ailerons Category: Controls
Cut the fiberglass out of the internal cavity of the pilot side wing at the aileron. Cut out the foam to make room for the full motion of the aileron. Applied slurry in prep for glassing tomorrow. Sanded opposite side of the wings and filled where needed and filled the upward side of the top of the pilot side wing where it was repaired. Finally, installed tubing (Cabo) to the inside of the cabin to channel the rudder wires. I will glass them tomorrow.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.