Well, a hangar became available on Aug 15 at Apex Airport so I jumped all over it as waitlists are 1.5-2+ years at area airports. So, existing 4' x 4' table had to be releveled and I built a second one and leveled it as well. Finally, I built two tables for belt sander and band saw.