Project: SpiritOfMudsuck     -     Entry

May 01, 2021 1.2 Switch wiring Category: Instrument Panel
Labeled and prepared a 10' length of two conductor shielded 20 ga with spade connectors for primary ignition grounds. Labeled and prepared a 10' length of shielded three conductor 16 ga for ELT power and GPS input. Added a short length of unshielded 16 ga for testing NMEA stream at ELT.