Pulled up older, thick plastic from the rear of the hangar and disposed of in trash. Gathered plastic that had covered the fuselage and replaced it with a fresh piece of medium weight plastic.
Moved tools to open some space. Cleared/cleaned off wooded shelving and stored construction materials.
Moved the propeller to the rear wall.