Project: SpiritOfMudsuck     -     Entry

Oct 04, 2021 1.2 Port wing prep Category: Ext. Finish
Hung a plastic sheer to reduce disturbing dust around the hangar wall. Keeping the space open to encourage air flow for reducing isocyanate exposure from urethane. Set the port wing on three saw horses with the assistance of Greg Campbell and Britt Childress.