Project: wstoelting     -     Entry

Mar 28, 2020 2 Attachment Doubler Category: Wings
Installed upper and lower doubles to forward and aft spar fuselage attachment points for right wing. Located, drilled #30 holes 4 places per doubler. Mixed up Hysol epoxy, abraded mating surfaces. Cleaned, applied Hysol to mating surfaces. Installed rivets and fastener. Let cure 24 hours.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.