Project: wstoelting     -     Entry

Apr 12, 2020 1.5 Left Wing Gussets Category: Wings
Positioned wing to work. Sanded mating surfaces. Applied epoxy to gussets, positioned. Applied epoxy fillets to both sides of 8 gussets between spars and drag links.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.