Clamped root rib to butt rib with 1/8 inch spacer. Measured distance to fuselage mounting bosses. Measured and cut standoffs. Drilled mounting to butt rib. Riveted standoffs to butt rib. Drilled and cut features into web for clearance of fitting s and fuel lines.