Located piece in place on front spar and marked with Sharpie. Drilled for rivets on rib 1 and 2 rib caps. Scuffed mating surfaces, solvent cleaned. Mixed up epoxy and applied to mating surfaces. Positioned, clamped in place with straight edge, installed rivets and allowed 24 hour cure.