Project: wstoelting     -     Entry

Jun 28, 2020 2.5 False Rib Install In Right Aileron Leading Edge Category: Wings
Positioned leading edge, marked centerline for Control bracket and hinges. Marked offsets and measured. For other false rib locations. Sanded fiberglass leading edge bonding areas. Applied epoxy to ribs and installed. 24 hour cure.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.