Project: wstoelting     -     Entry

Jul 01, 2021 3 Left Wing Fabric Category: Landing Gear
Applied last span wise fabric tapes. The Leading edge and trailing edge. Used 6 inch wide tape on leading, and two 3 inch tapes for trailing. Marked out straight tape lines with pencil. Applied Polybrush, dried. Then applied wet polybrush when laying down the tape. Finally add a second coat of polybrush over the tape. Ironed out any bubbles, wrinkles.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.