Project: BuckRV-8     -     Entry

Jun 01, 2020 2.1 Side panel revisions; switch panel tab holes; diagram revisions Category: Instrument Panel
(No photos today).

1. Made some final labeling revisions on the side panels.
2. Drilled 1/32" deep slots for the anti-rotation washers on the right-side switch panel.
3. Made some revisions on the electrical schematics, especially the Essential Bus.
4. Re-routed the wires for the flap switch so they deconflict with the switch itself.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.