Project: BuckRV-8     -     Entry

Nov 22, 2020 2.3 Misc. Wiring Category: Electrical
1. Completed fabrication and installation of the main power feed to the Main Bus,
2. Fabricated and installed the low-amp feed lines to the Essential Bus relay, including a rather tricky installation of a surge diode between the Fast-On terminals.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.