1. Began fabricating the magneto leads.
2. Drilled holes in firewall and first bulkhead for magneto leads. Inserted bushings. Planned routing and support clamp installation.
3. Continued assembling firewall relay panel. Fabricated copper connector bar between main relay and starter relay. Fabricated jumper between main relay and battery bus.
4. Ran final two power leads from circuit breaker panel for GTN650.