Project: BuckRV-8     -     Entry

Feb 28, 2021 3 Wiring, avionics Category: Electrical
1. Finished pinning and assembling several more Garmin connectors.
2. Spent a long time wrangling wires, getting them looking less like spaghetti and more like loose bundles.
3. Installed the main instrument panel! It will be temporarily attached in place until I'm sure it doesn't need to come out again.
4. Connected several cannon plugs and Molex connectors behind the panel.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.