Project: BuckRV-8     -     Entry

Jul 12, 2022 1.2 Intake snorkel; Oil cooler plenum Category: Firewall Forward
1. Sanded the first application of pinhole filler on the intake snorkel.
2. Added a second round of filler.

3. Did the final coat of high-temperature paint on the oil cooler plenum.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.