1. Installed upper cowl. Marked the seams and junctions for filling and sanding. Removed upper cowl. Removed the lock pins on the three floating Skybolt receptacles I installed yesterday, then locked the receptacles. Adjusted the depth of four other receptacles.
2..Filed the edges of the inlet seams.
3. Applied filler to the edges of the cowl prop seam areas.
4. Applied filler to the edges of the inlet ramps.