Project: BuckRV-8     -     Entry

Feb 17, 2024 0.8 R flap fairing prep Category: Fuselage
1. Carefully sanded both sides of the R flap fairing and primed it.
2. Clecoed and test-fit the fairing, and decided to sand the back side a bit more.
3, Removed the fairing, sanded the back side mostly flat, then re-primed it.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.