Project: BuckRV-8     -     Entry

Aug 28, 2006 0 Shop construction Category: Research
(25.0 hours) This entry covers my contributions to the shop re-construction, painting, trim work, etc., over the course of two weeks. Much of the work was performed by Jim Franceen and his crew, who actually cut and hung the plywood. I painted the walls, installed the floor moldings and flourecent lights, and all the other little details.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.