Project: BuckRV-8     -     Entry

Jun 04, 2007 1.8 Forward baggage floor Category: Fuselage
Fitted and drilled the forward baggage floor to the support structure.

Fitted and adjusted the F-871PP forward baggage side panel. (The three already-installed platenuts in the front side of the the gear tower seem very, very tight. Even with Boelube and quite a bit of torque, the #8 screws do not want to go in past the halfway point. I'll have to investigate this further. Perhaps I'll need to run a tap through them.)

Countersunk the appropriate holes in the F-870C angle and installed the platenuts.

Dimpled and primed the right edge of the F-870PP floor, where the angle will attach.

Touched up the primer on parts of the aft cabin side covers where they were filed and sanded last week.