Project: BuckRV-8     -     Entry

Jan 07, 2008 3.4 Gear tower bolts; Mid-cabin covers Category: Fuselage
It was over 60 degrees outside today, and the workshop was balmy! Weird!

I began by drilling the 7/16" gear bolt holes in the floorboards, using the gear tower weldment holes as a template.

The rest of the evening, I installed the nutplates under the left and right mid-cabin covers. (I miss having the fuselage on the rotisserie -- bending over to install the platenuts is back-breaking after a while.)


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.