Project: BuckRV-8     -     Entry

Jul 07, 2008 4.5 Systems installation (flaps, servos); Svc bulletin Category: Fuselage
Continued installation of various components:

-- Riveted in the slide tube guide for the aileron trim servo.
-- Riveted in the attach bracket for the autopilot roll servo.
-- Measured for the fuel lines, fuel vent lines, and brake lines.
-- Planned for the wiring routes through the bulkheads and wing spar.
-- Re-installed the flap motor and actuator arm/blocks. Complied with Van's Service Bulletin (drilled and safety-wired the flap motor shaft.) [Superseded]


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.