Jul 15, 2009 1.5 Map pocket Category: Fuselage
I finished fabricating the lower-right map pocket. First, I countersunk the 0.040 sheet to accept the rivets that will attach the stiffener, then prepped and primed both parts. I'll rivet them together tomorrow. I also installed the three nutplates in the fuselage. The lower aft one was a MS21051-L08K one-leg type. (The upper-aft screw will use an existing nutplate that also attaches the flap actuator cover.)