Project: BuckRV-8     -     Entry

Nov 04, 2010 2.5 Brake lines; Wiring clamps; Wiring Category: Fuselage
I decided to permanently install the right brake line today. (I'd already fabricated most of it long ago -- today, I cut the lower end to length, installed the fitting, and flared it.) I can't install the left brake line yet, because I still have to make and install two fuel lines through the bottom of the left gear tower first.

Next, I installed four or five Adel clamps along the cross-cockpit brace in preparation for running lots of wires later. Because of some possible interference with the harnesses that will come off the avionics hub mounted below, there's a possibility that I'll have to invert three or more of the clamps.

I also began twisting some 18AWG wire pairs for use in the fuselage.