Project: RobertFOX     -     Entry

Oct 10, 2023 7.0 Camlocks, fuel caps, fuel placards, site tubes Category: Fuselage
Camlock studs installed top cowl, top four camlocks on turtle deck. oil door installed, fuel caps painted, high temp RTV applied to wiring hole/access through firewall. Got some clips nuts install on forward fuselage just aft of firewall for anchoring boot cowl. Camlocks and looking for parts took ALL day. Didn't get as much done today as desired.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.