Project: I-CAVS     -     Entry

Jun 02, 2019 2 6-3 step 2 VS pre-assemble and matchdrill Category: Tail Feathers
pre-assemble with cleco all the structure and final drill Vertical Stabilizer structure using #30 dril

Prepare nose ribs trimming the corner as indicated in the horizontal stabilizer section to prevent dents in the skin during final assembly

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.