Project: I-CAVS     -     Entry

Mar 15, 2020 4 8-12 step 1-2 HS Skin on cradles and cleo structure rivet front ribs Category: Tail Feathers
positioned skins in the cradles. clecoed all front ribs to the skins.
started riveting with flush rivets.
Using the rivet swivel set didnt really help setting good rivets. I had to drill out a couple.
Changed to flush-rivet set and it worked better, although i pushed a bit too hard in two spots (skin is slightly deformed around a couple of rivets, but no major dents.
Rivets on the Inspar ribs (AN470AD4-7 and 8) are not very well set. little marring due to the squeezer.
Drilled out a bad rivet with angle drill (not easy to access) and replaced with slightly better results.
CHECK WITH LUCIO on the RIVETS on HS-905 Inspar Nose RIBS.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.