Project: I-CAVS     -     Entry

Apr 27, 2020 2 10-15 step 2 TAILCONE Countersink Longerons Category: Fuselage
Checked depth of the countersink using scrap skin with @40 dimples.
adiusted CSK cage 8 clicks more than flush.
Countersunk the two longerons after clamping to the table.
in two occasion the csk stop didnt work properly resulting in a sligthly enlarged countersink. Reason is the stop-nut becoming loose with vibration.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.