Project: I-CAVS     -     Entry

Jan 16, 2020 1 10-2 step 2-3 TAILCONE Bulkhead 1010 preassemble Category: Fuselage
Prepare F1012A and F1012 B. Clamp tie down assembly in position.
matchdril #30 and 3/16"" as indicated.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.