EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
- Entry
Date:
Jan 18, 2020
Hours:
10-3 Step 2-3 TAILCONE F1011 Bulkhead preassembly
Category: Fuselage
Description:
Position and clamp F1011A, F1011E, F1011C on the F1011 Bulkhead and matchdrill with #30.
Drill and cleco all the parts.
Drill two holes to 5/8"" as indicate in drawings.
Position and final drill F1011E
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.