Project: I-CAVS     -     Entry

Jan 18, 2020 10-3 Step 2-3 TAILCONE F1011 Bulkhead preassembly Category: Fuselage
Position and clamp F1011A, F1011E, F1011C on the F1011 Bulkhead and matchdrill with #30.
Drill and cleco all the parts.
Drill two holes to 5/8"" as indicate in drawings.
Position and final drill F1011E


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.