Project: I-CAVS     -     Entry

Feb 08, 2020 0.5 10-9 step 1-2 TAILCONE Bellcrank ribs match drilling Category: Fuselage
Assembly of the F-1006 Bulkhead to the left and right skins and to the bellcrank ribs.Final drill all holes with #30 drill bit.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.