EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
- Entry
Date:
Feb 08, 2020
Hours:
0.5
10-9 step 1-2 TAILCONE Bellcrank ribs match drilling
Category: Fuselage
Description:
Assembly of the F-1006 Bulkhead to the left and right skins and to the bellcrank ribs.Final drill all holes with #30 drill bit.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.