Project: I-CAVS     -     Entry

May 22, 2020 3 8-13 step 6-7 HS check rivets and complete HS Category: Tail Feathers
After COVID restriction have been lifted i had finally the possibility to have Lucio inspecting the work done alone.
On the Horizontal stabilizer Lucio found only a 20-30 rivet that required a bit of rework and only 5-6 that he decided to drill out as the manufacturing head was protruding a bit.
Closing the Horizontal stabilizer with the pop riveter was a very easy task

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.