Project:
I-CAVS
- Entry
Date:
Jun 16, 2020
Hours:
4
10-21 Tailcone step 1-3
Category: Fuselage
Description:
riveted nutplates to bell crank rib angles. Riveted the angles to the Bellcrank Ribs. Riveted the Bellcrank ribs to the skin.
AVOIDED riveting to the F-1006 bulkhead.