Project: I-CAVS     -     Entry

Sep 16, 2020 0.5 13-3 Main Spar Left wing step 1-4 Category: Wings
Inspected all nutplates installation looks ok, rivets within tolerances based on the pictures taken with GoPro.


No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.