Hardware seems to be installed correctly.
I final drilled the Aileron Bellcrank Brackets with 1/4 drill bit to remove the powder coating as indicated in the instructions
CHECK TORQUE.
MISSING LACQUER on two nuts on spar.
INSERT PICTURES FROM OUTBOARD BAY TO TANK BAY