Project: I-CAVS     -     Entry

Sep 16, 2020 0.5 14-6 Wing Ribs Left Wing step 1 Category: Wings
Inspected bolts, nuts and washers using GoPro.
All the longeron nuts are sealed with red lacquer.
to check the bolt heads we need to remove the tanks
CHECK TORQUE?

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.