Project: I-CAVS     -     Entry

Oct 12, 2020 3 18-6 fuel tank left and right step 1-6 Category: Wings
Verification of quick build assembly. Apparently everything looks fine, riveting and tank seal seem to be done according to plan.
However closer inspection during the installation of the fuel floater indicates that the vent lines have not been bent enough to avoid interference with the fuel floater.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.