Project: I-CAVS     -     Entry

Jan 13, 2021 12 23-3 Aileron Actuation Left and Right step 1-5 Category: Wings
Fabricated the W-1018A bell crank to aileron pushrods cutting the ST4130-035 tubes. Unfortunately i had to repeat this step several times due to difficulties in drilling straight and perpendicular to the rod. I enriched significantly my knowledge on multilingual cursing. Final result is not perfect but functional and acceptable.
Deburred and primed all the parts.
Final riveting the threaded rod ends to both sides on both pushrods.
Fabricated the W-1031 Aileron Bellcrank spacers.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.