Project: I-CAVS     -     Entry

Jan 15, 2021 12 23-5 Aileron Actuation Left and Right step 1-4 Category: Wings
Preassemble of the aileron forward and back torque assembly. A couple of mistakes required to reorder a couple of parts. Final drill definitely easier than the other pushrods. Priming done with rattle can primer. Unfortunately the curing didn't go well so i had to repeat a couple of times. Probably the temperature was not ideal. A lot of trimming was required in order to slide the tubes into the torque tube subassembly. Final result looks satisfactory.

Priming of the torque tube is still missing.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.