Project: I-CAVS     -     Entry

May 10, 2021 8 9-18 Elevators step 1-8 Category: Tail Feathers
Cut hinge, drilled first two #40 holes. Clecoed and matchdrilled the hinge on both elevators. Deburred all the holes. Started riveting on left elevator. One opps rivet used due to enlarged hole (countersinking). Riveted trim tabs and elevator spar hinge with manual squeezer for better accuracy. Trimmed hinge to measure and adapted the hinge pin. Hinge pin bending has been easier than expected. Safety Wire Missing.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.