Project: I-CAVS     -     Entry

May 02, 2021 3 9-17 elevators step 8-10 Category: Tail Feathers
riveted tab horns to trim tabs. Installed the foam ribs using tank sealant. Clecoed trim back spar and blocked the trim tab with clamps.
Riveted the side tabs with blind rivets. Waited for the sealant to cure


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.