EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
- Entry
Date:
May 02, 2021
Hours:
3
9-17 elevators step 8-10
Category: Tail Feathers
Description:
riveted tab horns to trim tabs. Installed the foam ribs using tank sealant. Clecoed trim back spar and blocked the trim tab with clamps.
Riveted the side tabs with blind rivets. Waited for the sealant to cure
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.