Project: I-CAVS     -     Entry

Mar 07, 2021 20 12-2 empennage fairing step 2-4 Elevator Fairing Category: Tail Feathers
Trimmed elevator fairings. Inserted in elevator tip and matchdrilled. Installed aluminum band with epoxy to strengthen the structure (aluminum 0.025). Final drilled #30. Used flox to make smooth transition to the skins. work done over a full weekend. Sanded many times and added flox many times.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.