Project: I-CAVS     -     Entry

Mar 15, 2021 24 12-3 Empennage Fairing Step 5-11 Category: Tail Feathers
Work performed during the whole week.
Trimmed the stabilizer fairing (wrong cut, ended up with too big distance to elevator counterbalance). Decided to reconstruct the trimmed away part using foam and epoxy and fiberglass. Three layer on both fairings and some sanding and flox. End result is within tolerance, may need some additional final adjustment after final empennage assembly and rigging. Added aluminum strips to strengthen the fairing. Matchdrilled and final drill #30 for pop rivets.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.