Project: I-CAVS     -     Entry

Jan 22, 2021 3 28-10 Fwd Fuse Ribs, BHDS & Bottom Skins step 1-14 Category: Fuselage
Long inspection of all the different assembly steps. Priming looks thin. Considering to reprime before final interior paint.
Removed side and bottom panels drilling out pop rivets.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.