Project: I-CAVS     -     Entry

Jan 06, 2021 3 34-3 Baggage door step 1-4 Category: Fuselage
Positioned the baggage door external skin in the baggage door opening. Marked according to instruction the skin and the fuselage as preparation for the installation of the hinge.
Cut an AN257-P3 hinge length to measure and drilled the #40 rivet holes at 1"1/8 distance from each other starting 1/4 inch from both hinge ends.
Positioned the hinge on the frame within the two marks in step 1. Matchdrilled #40 into through the hinge into the frame.
Slightly trimmed the skin.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.