EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
- Entry
Date:
Jul 12, 2021
Hours:
5
29-20 Fuse Side Skins step 1 left and rightfloor panel
Category: Fuselage
Description:
Installed the floor panels (left and right) with significant effort in bending the panels into the right positions.
Riveted with pull rivets the left panel. Used some paper to protect the paint.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.