Fabricated the F-1089 Elevator Push Rod assembly cutting to size the aluminum tube and match drilled for pop rivets using the paper templates (attention to the scaling when copying ....).
As per instruction i used the primer internally and let it dry for a couple of days.
Installed the VA-111 threaded rod ends and riveted using pop rivets.
Installed the rod bearings with jam nut and stored away waiting for preliminary assembly